建设工程施工合同英文版

篇一:建筑施工合同中英文对照

建设工程施工合同

发包方(甲方)xxxx

Party A: xxxx

承包方(乙方)xxxx

Party B: xxxx

本合同由如上列明的甲、乙双方按照《中华人民共和国合同法》、《建筑安装工程承包合同条例》以及国家相关法律法规的规定,结合本合同具体情况,于xx年x月x日在xx签订。 This contract is signed by the two Parties in xxxx on xxxx according to the “Contract Law of the People’s Republic of China”, the “Regulation on Building and Installation Contracting Contract”, and other relevant national laws and regulations, as well as the specific nature of this project

第一条 总则

Article 1 General Principles

1.1合同文件

Contract Documents

本合同包含合同、展示、施工图纸、作法说明、招投标文件以及合同所指的其他文件,它们均被视为合同的一部分。合同文件应该能够相互解释,互为说明。组成本合同的文件及优先解释的顺序如下:本合同、中标通知书、投标书及其附件、标准、规范及有关技术文件、图纸、工程量清单及工程报价单或预算书。合同履行中,发包人承包人有关工程的洽商、变更等书面下一或文件视为本合同的组成部分。

This contract includes the contract itself, exhibits, construction drawings, explanations of work procedures, tender documents, as well as other documents specified by the contract. The contract documents should be mutually explainable and mutually descriptive. The documents that constituted the contract and the priority hierarchy of explanations of the documents are as follows: this contract; the official letter of winning the tender; Letter of bidding and its annex, standards, guidelines, and relevant technical documents, drawings, Bill of Quantity (BOQ), quotation of prices, and project budget. During the implementation of the contract, any written agreements or documents between two parties such as change-orders are also regarded will be deemed as part of this contract.

1.1.1项目概况

Project Introduction

1.1.2工程名称:xxxx

Name of Project: xxxx

1.1.3工程地点:xxxx

Location of Project: xxxx

1.1.3.1工程范围:除了本合同其他条款另有说明外,乙方应提供为履行合同所需的所有服务,用品以及其他保障工程进行所需的必要花费以完成下列工作:

Scope of the project: unless otherwise explained by other articles in this contract, Party B shall provide all services, utensils, and other necessary cost for the implementation of this contract; the scope of project includes, but not limited to:

※室内装饰工程,详见附件一和附件二

Inner decoration, see appendix 1 & 2

※室外装饰工程(门窗、屋面、台阶等),详见附件一和附件二

Fa?ade(including doors, windows, roof and stairs) see appendix 1 & 2

※电器工程,详见附件一和附件二

Electronic Engineering, see appendix 1 & 2

※空调工程,详见附件一和附件二

Air Conditioning System, see appendix 1 & 2

※给排水及采暖工程,详见附件一和附件二

Water Supply, Sewage and Heating System, see appendix 1 & 2

※消防工程

Fire Control System, see appendix 1 & 2

※其他图纸上所列项目(任何对原定设计的变更应提供新的图纸并有甲方的签字确认)以上所有的工程项目以下统称为“工程”。

Other items listed in the construction drawings (any changed drawings shall be provided and confirmed by Party A). All these aforementioned items are generally referred as “project” hereafter.

1.1.3.2承包方式:乙方以包工包料,包工程质量,包安全,包文明施工的方式承包工程

Nature of Contracting: Party B shall be responsible for both labor and materials for this project, and will responsible for the quality of this project, safety, as well as code of conduct during the construction project.

1.1.4甲方工地代表由甲方指派。

On-site representative of Party A shall be appointed by Party A

1.1.5开工日期xxxx

Date of the project beginning: xxxx

1.1.6竣工日期xxxx

Date of the project completion: xxxx

1.1.7工程质量:质量合格,达到本合同要求和国家质量验收标准,并确保竣工验收一次合格。验收内容包括但不仅限于:①隐蔽工程;②分项工程;③实验报告;④材料检验报告。如果由于验收未能一次通过而导致后续工程开工的延迟,乙方将按照每日工程总款的2‰金额赔偿给甲方作为罚金,但最多不超过工程总价款的5%。

Quality of Project: The quality should be “Excellent”, and shall meet the requirements by this contract and the National Quality Standards, and should be guaranteed to be accepted at

the first attempt upon project completion, and shall also LEED certified. The scope of as-built acceptance includes, but not limit to: ①concealed work, ②itemized project, ③reports of experiments, and ④reports of material testing. In the event of project fails to be accepted at the first inspection and thus incurs delays beginning of the subsequent projects. Party B shall compensate Party A at the daily rate of 2‰ of the total contract amount as penalty, but the total amount shall not exceed 5% of the total contract amount.

1.1.8工程资质:在实施此合同所涉及的工程时,乙方应确保其具有相关资质。如乙方因为不具备相关资质导致甲方的损失或工程进度的滞后,乙方承担全部责任。

Qualifications: Party B represents and warrants it is competent and legitimate to carry out the services that set forth under this Agreement when implementing this contract. Party B shall be responsible for any delay of the construction induced by their insufficient qualifications.

1.2合同价款:

Contract Amount

本合同价款为人民币 xxxx,为固定总价合同价款。

The total contract amount is xxxx, which is fixed contract amount

本合同包括设备材料费、人工费、机械费、管理费、利润、税金、代办费用、保险费、运输费、劳务费用、总承包服务费以及为完成工程所必须的其他一切费用,和工程各系统检验检测、安装调试等费用。该款项为甲方应付给乙方的全部费用,并已经包含物价变动因素。

This agreement includes the cost of equipment and materials, labor cost, machinery cost, management cost, profit, tax, government charges on behalf of Party A, insurance, transportation, labor, subcontract service fee, and all other cost for the completion of the project, as well as every system testing, installation, and commissioning costs. This total contract amount is exact amount that Party A shall pay to Party B and it includes the fact of price fluctuation.

1.3工程结算

Final Audit of project

1.3.1本工程计价依据GB50500-2008《建设工程工程量清单计价规范》采用固定总价,除施工期间甲方要求变更现有图纸及发生的增减项洽商,甲方将作价格调整。

This project is using fixed total amount according to GB50500-2008 the Pricing Guidelines by Code of Quantity in Construction Projects, except that Party A may make price adjustment in the event of the existing construction drawings are changed or add or remove any construction work according to the request of Party A

1.3.2 所有的人工费用都不得以任何理由进行过调整,结算时只接受投标文件中约定的价格。

All labor cost shall NOT be adjusted in any event. Only the prices stimulated in the bidding documents are accepted at the final audit after completion.

1.3.3 因工程调整而产生的工程洽商,如洽商费用超过人民币五万元整,则洽商文件必须在工程中期验收当日被提交给甲方,所产生的洽商费用在交付中期款时一并核算结清。如洽商费用低于五万元人民币整,则洽商文件必须在工程验收当日内提交给甲方,所产生的费用在交付工程验收款时一并核算结清。

If the cost of change orders are over RMB 50,000 Yuan, then all change orders issued because of the construction adjustments shall be submitted to Party A on the same day of the construction mid-term check and acceptance, and the approved amount will be paid to Party B with the construction mid-term payment; if the costs of the change orders are less than 50,000 Yuan, then all change orders issued because of the construction adjustments shall be submitted to Party A on the same day of the construction completion check and acceptance, and the approved amount will be paid to Party B with the construction completion payment.

第二条:政府批复

Article 2 Government Approvals

2.1 乙方负责协助甲方办理此项施工需要办理的所有政府报批,包括但不仅限于消防、环保的报批与其他与本工程相关的报批,甲方负责政府行政审批的费用。

Party B shall be responsible to process government approvals related to the project, including but not limited to: fire control, environment protection and other approvals related to this Project. Party A is responsible for the costs of these approvals

2.2 乙方负责其工程报备

Party B shall be responsible for construction applications, approvals and related costs.

2.3 乙方应承担2.2所述报备不全而导致的政府罚金,并且不能顺延工期。

Party B shall be responsible for any government fines due to incomplete approval processes, and should NOT cause delay in the construction period.

第三条:甲方的权利和义务

Article 3 Rights and Obligations of Party A

3.1 向乙方提供经确认的施工图纸或做法说明五份,并向乙方进行现场交底,向乙方提供施工所需要的水电设备,并说明使用注意事项。

Party A shall provide FIVE copies of confirmed construction drawings and explanations of work procedures, and shall conduct technical clarification. Party A shall provide Party B with necessary water and power equipment and the instructions on using the equipment.

3.2 指派xxxx为甲方驻工地代表,负责合同的履行。对工程质量、进度进行监督检查,办理验收、变更事宜。甲方的工地代表如果认为乙方的某雇员行为不当或散漫不羁,或甲方认为该雇员不能胜任,则乙方应立即进行撤换,并且未经甲方实现书面许可,乙方不得在施工中再行雇佣该等人员。被撤换的任何人员应尽可以能立即由甲方代表所批准的胜任的人员代替。 Party A appoints xxxx as the on-site representative to supervise the fulfillment of contract

obligations, to oversee the quality control and check the project progress, and to handle issues such as acceptance and variations. In the event of the on-site representative of Party

A believes that any employee of Party B has improper conduct or misbehaviors, or if Party A consider such employee is not competent for the relevant work, Party B shall dismiss and replace this employee immediately; and unless having received consent by Party A in writing in advance, Party B shall no longer hire the specified employee in the following phase of this project. Party B should make every effort to replace the dismissed employee with competent personnel authorized by on-site representative of Party A.

3.3 甲方按照付款约定向乙方支付工程款。

Party A should make payments to Party B according to the payment terms.

3.4 如甲方认为乙方确已无能力继续履行合同的,则甲方有权解除合同,乙方必须在接到甲方书面通知后两周内撤离场地以便乙方继续施工。对乙方完成工程量的结算不作为撤离场地的条件,结算应在竣工一个月之内完成,付款方式按照本合同条款。

In the event of Party A consider Party B is indeed unable to further fulfill its contract obligations, then Party A has the right to terminate the contract, and Party B should vacate the project site within two weeks after receiving Party A's notice, so that Party A can resume construction as soon as possible. Confirmation of finished quantity shall NOT be regarded as a prerequisite to Party B's vacation of the project site, and the confirmation should be processed within one month after the project completion. Payment shall be made according to the payment terms in this contract.

3.5 甲方有权要求乙方按照甲方的组织设计和施工工期进行施工,乙方如对甲方的要求和指令不予执行的,则按照乙方违约处理,乙方应承担违约责任。

Party A has the right to instruct Party B to do the construction according to Party A's organization and planned construction period; in the event of Party B ignores and refuses to observe Party A's instructions, Party B will be deemed as breach of the contract, and Party B shall be held responsible for the liabilities of breaching the contract.

3.6 甲方有权要求乙方服从甲方的统一安排和管理,乙方的施工人员必须遵守各项规章制度。对于乙方施工人员违规操作所产生的后果,乙方承担全部责任。甲方有权从工程总价款中扣除相应的款项。

Party A has the right to instruct Party B to observe the general arrangement and management by Party A, and the construction staffs of Party B must observe all rules and regulations. Party B shall be fully responsible for the consequences of such violations by the staff of Party

B. Party A has the right to directly deduct the corresponding amount from the total contract amount.

3.7 甲方所有的通知可以以书面或口头形式发出,乙方接获甲方的通知后应根据通知规定的内容执行。

All notices from Party A can be made both in writing and orally, but the oral instructions are only applicable to the representative of Party A. Party B shall, upon receiving notices from Party A, execute the corresponding matters according to the content of the notices.

3.8 未经甲方同意,乙方不得将工程转让或分包,对于乙方将工程擅自转让或分包的,甲方有权解除合同,乙方必须接受并承担由此造成的一切后果。

Party B shall NOT transfer or subcontract the project to any third party without the consent of Party A; in the event of Party B transfers or subcontracts the project to any third party without the consent of Party A, Party A has the right to terminate the contract, and Party B must accept and be responsible for any consequence of such violation.

3.9 甲方有权制定专业分包商,并按照乙方在投标文件中承诺的配合管理费率向乙方支付配合管理费。

Party A has the right to appoint special sub-contractors, and shall pay the management fee to Party B according to the rate of subcontract management and coordination fee stipulated in

篇二:建筑工程合同英文翻译

建筑工程合同英文翻译

依照《中华人民共和国合同法》、《中华人民共和国建筑法》及其他有关法律、行政法规、遵循平等、自愿、公平和诚实信用的原则,双方就本建设工程施工事项协商一致,订立本合同。

This Contract is hereby concluded between the parties concerned through friendly negotiation as to the construction matters of this project on the principle of equality, voluntariness, fairness and good faith according to the Contract Law of the People's Republic of China, the Construction Law of the People's Republic of China and other relevant laws and administrative laws and regulations.

一、 工程概况:

I. Project Profile:

工程内容:砖混三层;建筑面积606M2

Project content: Three floors with reinforced concrete structure; construction area: 606M2

群体工程应附承包人承揽工程项目一览表(附件1)

Mass construction project shall be attached with a schedule of the contracting projects of the contractor (Annex 1)

工程立项批准文号:洪经经计字[2006]60号

Project approval No.: HJJJZ [2006] No.60

资金来源:外资

Capital source: Foreign capital

二、 工程承包范围

II. Contracting Scope

承包范围:土建、装饰、水电安装等工程

Contracting scope: Civil engineering, decoration, water and power installation and other projects

六、组成合同的文件

VI. Documents Forming Part of the Contract

组成本合同的文件包括

Documents forming part of the Contract include

1、 本合同协议书

1. The Contract Agreement

2、 中标通知书

2. Bid-winning Notice

3、 投标书及其附件

3. Tender Document and Its Appendix

4、 本合同专用条款

4. Special Terms and Conditions of this Contract

5、 本合同通用条款

5. General Terms and Conditions of this Contract

6、 标准、规范及有关技术文件

6. Standard, Specifications and Relevant Technical Documents

7、 图纸

7. Drawings

8、 工程量清单

8. Bill of Quantities

9、 工程报价或预算书

9. Engineering Bid or Budget Statement

双方有关工程的洽商、变更等书面协议或文件视为本合同的组成部分。

The negotiations, changes and other written agreements or documents between the parties regarding this project are deemed as an integral part of this Contract.

七、本协议书中有关词语含义与本合同第二部份《通用条款》中分别赋予它们的定义相同。

VII. The words in this Agreement shall have the same meanings as are assigned to them in Part II of this Contract – General Terms and Conditions.

八、承包人向发包人承诺按照合同约定进行施工、竣工并在质量保修期内承担工程质量保修责任。 VIII. The contractor promises the employer to construct and complete this project according to the

stipulations of this Contract and assume this project’s quality-guarantee responsibilities within the quality warranty period.

九、发包人向承包人承诺按照合同约定的期限和方式支付合同价款及其他应当支付的款项。

IX. The employer promises the contractor to pay the contract price and other accounts payable according to the term and mode agreed in this Contract.

十、合同生效

X. Execution of Contract

本合同双主约定:法定代表人或委托代理人签字后生效。

The parties in this Contract agree: This Contract shall take effect upon the signatures of legal

representatives or entrusted agents.

合同工期总日历天数90天

Total calendar days in the Contract Period: 90 days

篇三:建筑施工合同中英文版专用合同条件

SECTION 03:PARTICULAR CONDITIONS OF CONTRACT

专用合同条件

CONDITIONS OF CONTRACT

合同条件

PARTICULAR CONDITIONS OF CONTRACT

专用条件

Note:

This part of the contract is prepared in Chineseand English. Should any discrepancy arise between Chineseand English,

Chinese shall take precedence.

注释: 此部分合同为中英文对照, 当中文和英文不一致时, 以中文为准.

This Section includes Part II “Particular Conditions” of the Conditions of the Contract. Together with Part I “General Conditions”, it comprises the conditions governing the rights and obligations of the parties for the Project. It contains alterations, amendments and additions to the General Conditions and shall be read in conjunction therewith. Particular Conditions shall prevail over the General Conditions.

本章包括合同条件的第二部分“专用条件”。“专用条件”与第一部分“通用条件”共同组成本工程项下双方权利和义务的条款。专用条件包含对通用条件的变更和补充,须与通用条件一起读解。在专用条件和通用条件之间,专用条件优先适用。

SECTION 03:PARTICULAR CONDITIONS OF CONTRACT ...................................... 1

1 GENERAL CONDITIONS ............................................................................................................ 8

1.1

1.2

1.3

1.4

1.5

1.6

1.7

1.8

1.9

1.11 DEFINITIONS ............................................................................................................................ 8 INTERPRETATION.................................................................................................................... 13 COMMUNICATIONS ................................................................................................................. 13 LAW AND LANGUAGE ............................................................................................................ 14 PRIORITY OF DOCUMENTS .................................................................................................... 15 CONTRACT AGREEMENT ....................................................................................................... 16 ASSIGNMENT ......................................................................................................................... 16 CARE AND SUPPLY OF DOCUMENTS ..................................................................................... 16 DELAYED DRAWINGS OR INSTRUCTIONS .............................................................................. 17 CONTRACTOR'S USE OF OWNER'S DOCUMENTS ................................................................. 18 1.10 OWNER'S USE OF CONTRACTOR'S DOCUMENTS ................................................................. 17

1.12 CONFIDENTIAL DETAILS ........................................................................................................ 18

1.13 COMPLIANCE WITH LAWS ...................................................................................................... 18

1.14 JOINT AND SEVERAL LIABILITY ............................................................................................. 18

2 THE OWNER ............................................................................................................................... 18

2.1

2.2

2.3

2.4

2.5

3 RIGHT OF ACCESS TO THE SITE ............................................................................................ 18 PERMITS, LICENCES OR APPROVALS ................................................................................... 19 OWNER'S PERSONNEL .......................................................................................................... 19 OWNER'S FINANCIAL ARRANGEMENTS ................................................................................ 19 OWNER'S CLAIMS .................................................................................................................. 19 THE OWNER’S REPRESENTATIVE ....................................................................................... 19

3.1

3.2

3.3

3.4

3.5 OWNER'S REPRESANTATIVE’S DUTIES AND AUTHORITY ...................................................... 19 DELEGATION BY THE OWNER’S REPRESENTATIVE ............................................................... 20 INSTRUCTIONS OF THE OWNER’S REPRESENTATIVE ............................................................ 20 REPLACEMENT OF THE OWNER’S REPRESENTATIVE ........................................................... 20 DETERMINATIONS .................................................................................................................. 20

4 THE CONTRACTOR .................................................................................................................. 21

4.1

4.2

4.3

4.4

4.5

4.6

4.7

4.8

4.9

4.11 CONTRACTOR'S GENERAL OBLIGATIONS ............................................................................. 21 PERFORMANCE SECURITY .................................................................................................... 21 CONTRACTOR'S REPRESENTATIVE ....................................................................................... 21 SUBCONTRACTORS ............................................................................................................... 22 ASSIGNMENT OF BENEFIT OF SUBCONTRACT ...................................................................... 22 CO-OPERATION ...................................................................................................................... 22 SETTING OUT ......................................................................................................................... 22 SAFETY PROCEDURES .......................................................................................................... 23 QUALITY ASSURANCE ........................................................................................................... 25 SUFFICIENCY OF THE ACCEPTED CONTRACT AMOUNT ........................................................ 26

4.10 SITE DATA .............................................................................................................................. 25 4.12 UNFORESEEABLE PHYSICAL CONDITIONS ........................................................................... 26

4.13 RIGHTS OF WAY AND FACILITIES ........................................................................................... 26

4.14 AVOIDANCE OF INTERFERENCE ............................................................................................. 26

4.15 ACCESS ROUTE ..................................................................................................................... 26

4.16 TRANSPORT OF GOODS ........................................................................................................ 26

4.17 CONTRACTOR'S EQUIPMENT ................................................................................................. 27

4.18 PROTECTION OF THE ENVIRONMENT .................................................................................... 27

4.19 ELECTRICITY, WATER AND GAS ............................................................................................ 27

4.20 OWNER'S EQUIPMENT AND FREE-ISSUE MATERIAL ............................................................. 28

4.21 PROGRESS REPORTS ............................................................................................................ 28

4.22 SECURITY OF THE SITE .......................................................................................................... 29

4.23 CONTRACTOR'S OPERATIONS ON SITE ................................................................................. 29

4.24 FOSSILS ................................................................................................................................. 30

5 NOMINATED SUBCONTRACTORS ....................................................................................... 30

5.1

5.2

5.3

5.4

6 DEFINITION OF "NOMINATED SUBCONTRACTOR" ................................................................. 30 OBJECTION TO NOMINATION ................................................................................................. 30 PAYMENTS TO NOMINATED SUBCONTRACTORS .................................................................... 30 EVIDENCE OF PAYMENTS ....................................................................................................... 30 STAFF AND LABOUR ............................................................................................................... 30

6.1

6.2

6.3

6.4

6.5

6.6

6.7

6.8

6.9

6.11 ENGAGEMENT OF STAFF AND LABOUR ................................................................................. 30 RATES OF WAGES AND CONDITIONS OF LABOUR ................................................................ 31 PERSONS IN THE SERVICE OF OWNER .................................................................................. 31 LABOUR LAWS....................................................................................................................... 31 WORKING HOURS .................................................................................................................. 31 FACILITIES FOR STAFF AND LABOUR .................................................................................... 32 HEALTH AND SAFETY ............................................................................................................ 32 CONTRACTOR'S SUPERINTENDENCE .................................................................................... 32 CONTRACTOR'S PERSONNEL ................................................................................................ 32 DISORDERLY CONDUCT ......................................................................................................... 33 6.10 RECORDS OF CONTRACTOR'S .............................................................................................. 33

7 PLANT, MATERIALS AND WORKMANSHIP ........................................................................ 33

7.1

7.2

7.3

7.4

7.5

7.6

7.7

7.8 MANNER OF EXECUTION ....................................................................................................... 33 SAMPLES ............................................................................................................................... 33 INSPECTION............................................................................................................................ 33 TESTING ................................................................................................................................. 34 REJECTION ............................................................................................................................ 35 REMEDIAL WORK .................................................................................................................. 35 OWNERSHIP OF PLANT AND MATERIALS .............................................................................. 35 ROYALTIES ............................................................................................................................. 36

8 COMMENCEMENT, DELAYS AND SUSPENSION .............................................................. 36

8.1

8.2 COMMENCEMENT OF WORKS ................................................................................................ 36 TIME FOR COMPLETION ......................................................................................................... 36

8.3

8.4

8.5

8.6

8.7

8.8

8.9

8.11 PROGRAMME ......................................................................................................................... 36 EXTENSION OF TIME FOR COMPLETION ................................................................................ 37 DELAYS CAUSED BY AUTHORITIES ....................................................................................... 37 RATE OF PROGRESS ............................................................................................................. 37 DELAY DAMAGES .................................................................................................................. 38 SUSPENSION OF WORK ......................................................................................................... 38 CONSEQUENCES OF SUSPENSION ........................................................................................ 38 PROLONGED SUSPENSION .................................................................................................... 38 8.10 PAYMENT FOR PLANT AND MATERIALS IN EVENT OF SUSPENSION ..................................... 38

8.12 RESUMPTION OF WORK ........................................................................................................ 38

9 TESTS ON COMPLETION ........................................................................................................ 38

9.1

9.2

9.3

9.4

10 CONTRACTOR'S OBLIGATIONS .............................................................................................. 38 DELAYED TESTS .................................................................................................................... 39 RETESTING ............................................................................................................................ 39 FAILURE TO PASS TESTS ON COMPLETION .......................................................................... 40 OWNERS TAKING OVER ..................................................................................................... 40 10.1 TAKING OVER OF THE WORKS AND SECTIONS ..................................................................... 40 10.2 TAKING OVER OF PARTS OF THE WORKS ............................................................................. 40 10.3 INTERFERENCE WITH TESTS ON COMPLETION ..................................................................... 40 10.4 SURFACES REQUIRING REINSTATEMENT .............................................................................. 41

11 DEFECTS LIABILITY ............................................................................................................. 41

COMPLETION OF OUTSTANDING WORK AND REMEDYING DEFECTS ................................... 41 COST OF REMEDYING DEFECTS............................................................................................ 41 EXTENSION OF DEFECTS NOTIFICATION PERIOD ................................................................. 41 FAILURE TO REMEDY DEFECTS ............................................................................................. 42 REMOVAL OF DEFECTIVE WORK ........................................................................................... 42 FURTHER TESTS .......................................................................................................(转载自:www.xiaocaOfaNWen.com 小草 范 文 网:建设工程施工合同英文版)............. 42 RIGHT OF ACCESS ................................................................................................................. 42 CONTRACTOR TO SEARCH .................................................................................................... 42 PERFORMANCE CERTIFICATE................................................................................................ 42 OBLIGATIONS..................................................................................................................... 42

CLEARANCE OF SITE ......................................................................................................... 42 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.9 11.10 11.11

12 MEASUREMENT AND EVALUATION ................................................................................ 43 12.1 WORKS TO BE MEASURED ..................................................................................................... 43 12.2 METHOD OF MEASUREMENT ................................................................................................. 43 12.3 EVALUATION .......................................................................................................................... 43 12.4 OMISSIONS............................................................................................................................. 43

13 VARIATIONS AND ADJUSTMENTS ................................................................................... 43 13.1 RIGHT TO VARY ...................................................................................................................... 43 13.2 VALUE ENGINEERING ............................................................................................................. 44